Client: WM Donald Ltd.
Sector: Construction
Services: Carbon Assessment and Carbon Offset to Become Carbon Neutral

WM Donald, with over 40 years’ experience as industry leaders within Civil engineering and construction, with a fleet of over 100 vehicles, and over 160 employees, established a newly constructed “low carbon” office to the best practise standards for environmental performance through design, specification, construction and operation.
Their operations base contained many low energy elements including an array of Air source heat pumps for heating and hot water and 100kW of Solar Panels to offset their electrical demand. They have also introduced water scavenging to reduce consumption and installed a reed bed filtration system for all water discharges. WM Donald sought the assistance of Carbon-Zero to establish their Carbon footprint and identify opportunities for further emissions reductions.
